Legal Compliance
CTE (NOC) –
- It involves making an application in a prescribed format to respective State Pollution Control Board along with required documents and scrutiny fees.
- It is followed by physical inspection of the site and assessment of the environmental management system proposed so as to meet with the mandatory requirement prescribed by State pollution Control Board.
CC&A(CTO) –
- Before starting / operating the activity. After getting NOC from the Board, the unit can start work related to start up the activity.
- And before operating the activity, the permission in the form of Consolidated Consent & Authorization [CCA] [Consent to Operate] has to be obtained, under Water Act-1974, Air Act-1981 and Environment Protection Act, 1986 and its amendment.
EC (Environmental Clearance) –
- Pre- feasibility Report and Form I to MOEF/SEIAA
- Presentation of TOR to EAC
- Award of TOR
- Setting up of Environmental Station to collect the data
- Environment and Social Baseline Study
- Project Description and EIA Terms of Reference
- EIA Studies and Impact Analysis:
- a) REIAA - A tool to identify, define and prioritize potential environmental impacts in disaster situations. It examines the direct and indirect effects of disasters and environment, Understand potential costs of ignorance of environmental impacts of disaster response, Discuss “good practices” in designing environmentally-sound disaster responses.
- b) Comprehensive EIA - It is usually undertaken after the initial screening and REIA to prevent or at least to considerable reduce activities that may have harmful effects on the Environment and Protected areas.
- Submission of EIA Report
- Notice for Public Hearing
- Conduct Public Hearing
- MOM of Public Hearing to MOEF
- Final EIA Report to MOEF
- Presentation to Environmental Assessment Committee
- Grant of EC
- Providing Technical Guidance for Liaison with Authority.
- Submission of compliance report to the Authority for the requirement given in EC with Monitoring and Analysis.
- Certification of Registered Recycler.
- Filling all online returns of GPCB.
- Technical correspondence with the Authority for the compliance of the legal issues.
- Environmental Study Reports For
- EMP - The Environmental Management Plan (EMP) covers the design, construction, commissioning, and operation and maintenance phases of each project component. The EMP identifies the key environmental issues across the project and provides strategies and plans for managing them effectively.
- Environmental Audit Report - Environmental audit reports are statutory documents and are issued after a statutory environmental audit of a property or site has been conducted under the Act.
-
Identify Problem or Issue
-
Set Criteria & Standards
-
Observe Practice / Data Collection
-
Compare Performance with Criteria & Standards
-
Implementing Change
- Treatability Report A treatability study is based on carefully designed laboratory-scale experiment that is intended to mimic full-scale conditions as closely as possible
- EMS Adequacy Study Report -- It is to develop and approve environmental apolicy as a statement of commitment.